PHASE 2 - PROJECT MILESTONES
Existing Conditions Aircraft Operations Analysis
- Collect airport operation statistics (radar flight data, airline schedule data, airport layout plan, etc.) – conducted between December 14, 2006 and November 5, 2007
- Construct airport and air traffic routing and flight procedure rules and assumptions for each of the six major configurations. – conducted between January 1, 2008 and December 16, 2008
- Calibrate the airfield/air traffic model (PDF 5.2 mb). – completed September 2, 2009
- Determine representative design day or peak month average weekday for the existing condition year and flight schedule. – completed November 5, 2007
- Calculate airfield/air traffic delay statistics. – completed December 16, 2008
- Document existing conditions average delay statistics and analysis (PDF 16.7 mb). – completed September 2009